NorrDigi® MCC significantly reduces costs and environmental impact thanks to multi-chamber cylinders and intelligent digital control systems. NorrDigi MCC delivers only the necessary power needed at any given time reducing energy losses and minimizing waste. NorrDigi MCC enables safe and precise movement control, optimizing work cycles and improving productivity based on individual operator preferences.
Excavator equipped with the NorrDigi MCC system has reached 50% fuel saving in field tests.
Valuable real-time insights using multiple data points from sensors for position, speed etc.
Based on individual operator preferences predefined movements enhance productivity up to +15%
Improve safety and avoid unwanted movements using end cushioning
Excess energy storage in high-pressure tanks for re-use when needed for peak load power
Utilization of key components in the "sweet spot area" for better fuel efficiency and lower cost
The NorrDigi MCC system is based on patented multi-chamber hydraulic cylinders, special control valves and software-based logic.
Field tests conducted with Volvo EC300E excavator showed as high as a -50% reduction in fuel consumption while maintaining the same performance as conventional hydraulic systems in machines of similar size.
Productivity gains have shown to be radical, with cycle time cut by -50% in pipe lifting application for onshore drill rigs. The results are way beyond anything available in the market, enhancing precision, durability and safety.
The test results revealed remarkable energy savings, with the NorrDigi MCC system recovering up to 70% of the energy during lifting cycles. Based on the conducted study, the system can potentially gain 40-50% more work hours with a single charge.
Data analysis based
on curren tmachine characteristics
System modelling in customer's machine
System construction and testing
Continuous optimization & quality assurance
Remote system monitoring
The system collects and processes valuable data, enabling analysis of events and judging system performance for development purposes.
The system collects valuable data, enabling real-time insights into performance and system health.
Norrhydro Group Oyj
Headquarter & production
Ratavartijankatu 2
FI-96100 Rovaniemi, Finland
Cargo-in: +358 40 618 4054
Product development
Raspinkatu 4
FI-33840 Tampere, Finland
Engineering office
Microkatu 1
FI-70210 Kuopio, Finland